ON SITE.ON SCHEDULE.
Transformers, generators, battery cabinets, and IT gear, delivered to your build schedule. Send us the project and AFL coordinates every load with vetted specialized carriers.
Power EquipmentHeavy power, tight windows. We run the schedule.
You set the delivery windows. We line up every load to them.
- Transformers, permitted and escorted
- Generators and enclosed power units
- Battery cabinets matched to qualified carriers
- Servers and IT on air-ride equipment
- Deliveries sequenced to your build
From a 1 MW enclosed generator to structural steel, rebar, and server racks, AFL coordinates the full equipment list for a data center build through its vetted carrier network, with damage prevention planned into every load.
How AFL coordinates a data center build.
Five steps, one accountable partner, from the equipment list to the receiving window.
Scroll to walk the build, or click a stage.Swipe to walk the build.Click a stage to walk the build.





Tell us your challenge. We’ll build the logistics plan to solve it.
One accountable partner for your data center build. Every piece planned, permitted, and sequenced to the schedule, from transformers to server racks.



